Business
Inspection of Plant Facilities, etc
print
  •  Completion Inspection


    • Completion Inspection is conducted for the installation or modification of production or general handling facilities to verify their compliance to the Hazardous Material Safety Management Act.
    • Objects

    • Completion Inspection shall be conducted at the installation or modification of the production or general handling facilities with capacity not less than 3,000 times of the designated volume (excluding repair or partial expansion of existing production or general handling facilities).

    • Completion Inspection shall be conducted at the installation or modification of the production or general handling facilities with capacity less than 3,000 times of the designated volume by the competent fire station.

  •  Safety Assessment of Hazmat Facilities


    • Special concession can be allowed for the hazmat facilities constructed with new technology and not suitable to be applied with conventional standards and regulations by safety evaluation of KFI.
    • Objects

    • This system is applicable the hazmat facilities requiring review of experts, for example, special structure or new equipments where special concession should be considered.
    • Examined by the Safety Evaluation Committee consisted of the specialists of the art.

    • Assess that the special structure or equipment can provide equal or better performance than the design based on the standards of position, structure and equipment.